
This facility consisted of administrative offices, dispatch, support, and lunch room along with a 9,000 square foot tractor and trailer high bay staging facility for CHP accident investigations. An extensive secured paved storage area utilizes a bioscale drainage system with a covered wash bay. The building's tech aesthetics include horizontal rib metal wall panels, cable stayed canopies constructed of standard metal stud track and tilt-up concrete panels with sloping parapet lines and is an attractive standout in this industrial area.